Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative observed the paving contractor NWGP continue subgrade preparation at the roundabout clipping subgrade soils and stabling at the westside drive to the bridge using Tensar stablization fabric in one isolated area twenty feet long in areas already clipped 4". The contractor completed subgrade preparation, and it was approved for the placement of subbase stone. The contractor continued subbase preparation at the roundabout and also subbase preparation at Nature Walk Parway, west side of bridge, by wetting and compacting. The grading contractor Thompson begin demucking wash silt from detention pond at Unit 4, Phase 2. The excavated silt materials were removed using a long reach backhoe and was spread along the existing slope at the back of amenity parking lot. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Washed silt in detention pond at Unit 4 phase 2
2
Using the long reach excavator removing washed silt from pond.
3
Subbase prep. at west side of bridge
4
Compacting subbase at Nature Walk Pkwy.
5
Spreading subbase stone over Tensar fabric at roundabout
6
Tensar fabric in place
7
Observing subgrade depth at roundabout
8
Observing proof roll of subgrade at roundabout
9
Delivery ticket used for proof roll
10
Subgrade proof roll at roundabout
11
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel