Daily Field Report

Date :01/20/2021
Project No :2021C005
Client Company :DR Horton
Arrival Time :01/20/2021 08:00
Onsite Hours :04:00
Name of the Project :Flat Rock Ph 2-Lime Application
Project Location :Evans Mill Road at Browns Mill Road, Stonecrest, GA
Weather :Cloudy
Departure Time :01/20/2021 12:00
ASEC Technician Name :Dave Bek

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

  • Additional compaction was performed on lots 83 and 84 using a full size Sheep’s Foot Compactor.
  • Offsite Fill material was brought to the site and stockpiled on lot 85. This material was mixed with lime (using a CAT Excavator) and then spread across lot 84 (with a skid steer loader)

Lot 84

Lot 85

Technician Signature / DateDave Bek, January 20, 2021
Reviewer Name / DateRamchandra Mogulla, January 24, 2021