Daily Field Report

Date :01/20/2021
Project No :
Client Company :DR Horton
Arrival Time :01/20/2021 11:00
Onsite Hours :04:00
Name of the Project :Monet Gardens
Project Location :River Road at Green Pastures Way, Ellenwood, GA
Weather :Cloudy
Departure Time :01/20/2021 15:00
ASEC Technician Name :Dave Bek

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

  • Work continued on Wall 1 (West of lot 9)
    • Rip rap was placed by Dekalb Pipeline to remediate the drainage of the detention pond outlet.
    • The contractor installed 34 stone wrapped in separation fabric to the section of Wall 1 from 0’ – 55 ‘
  • Grading continued on lots 10 – 19

Drainage Remediation Retention Pond Outlet

57 Stone wrapped in separation fabric - Retaining wall foundation

Grading lot 10 - 19

Technician Signature / DateDave Bek, January 20, 2021