Skip to content

Density Test Report

Date :05/14/2021
Project No :
Client Company :Toll Bros. Inc.
Arrival Time :05/14/2021 13:00
Onsite Hours :05:30
Name of the Project :Northfields at Polo Fields
Project Location :4805 Pittman Road, Forsyth County, Georgia
Weather :Sunny
Departure Time :05/14/2021 18:30
ASEC Technician Name :Dave Bek

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/14/2021 1 24.9 99.6 P-1 97.7 22.2 101.9 95 D6938 Pass
Location : MH-B2 - MHB3, Elv/Depth :5 feet below grade
Comment : Gauge Serial No. :29588
05/14/2021 2 27.3 93.9 P-1 97.7 22.2 96.1 95 D6938 Pass
Location : MH-A2 to MH-CA22, Elv/Depth :5 feet below grade
Comment : Gauge Serial No. :29588
Technician Signature / DateDave Bek, May 14, 2021
Reviewer Name / DateRamchandra Mogulla, June 13, 2021