Daily Field Report

Date :03/05/2021
Project No :
Client Company :Toll Bros. Inc.
Arrival Time :03/05/2021 09:00
Onsite Hours :04:00
Name of the Project :Northfields at Polo Fields
Project Location :4805 Pittman Road, Forsyth County, Georgia
Weather :
Departure Time :03/05/2021 13:00
ASEC Technician Name :Andrew McCullough

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques wee employed to assure compliance with project drawling/specifications, applicable codes, and materials submittals. The following observation were made on site today.

  1. Finalizing the excavation of retention pond  Sd4-3 and started the excavation of the diversion ditch running from Sd4- NorthWest to Sd4-3.
  2. While waiting approval for the previously recommended under drainage system for lot 1; The contractor excavated a draining trench running the center line from the North end of lot 1, too the construction entrance storm drain to promote positive drainage.
  3. Lots #10-#11 where walked and staked by CGU for the placement of the temporary retention pond Sd4-2. The contractor proceeded to strip the area into the weekend.
Technician Signature / DateAndrew McCullough, March 5, 2021
Reviewer Name / DateRamchandra Mogulla, March 12, 2021