Daily Field Report

Date :03/08/2021
Project No :
Client Company :Toll Bros. Inc.
Arrival Time :03/08/2021 08:30
Onsite Hours :05:00
Name of the Project :Northfields at Polo Fields
Project Location :4805 Pittman Road, Forsyth County, Georgia
Weather :Sunny
Departure Time :03/08/2021 13:30
ASEC Technician Name :Andrew McCullough

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques wee employed to assure compliance with project drawling/specifications, applicable codes, and materials submittals. The following observation were made on site today.

  1. Over the weekend, the contractor completed stripping up to 2’ of topsoil off in some places of Sd4-2, upon completion, the contractor ran into a high water table on the East side of lot #11 running to the South side of lot #11. The contractor cut a draining trench from the North End of the lot #11 down the the South East corner and placed a pump to help drain the abundant ground water.
  2. The contractor started the earth work for temporary retention pond Sd4-4.

Trench from the North End of the lot #11 down the the South East corner

Technician Signature / DateAndrew McCullough, March 8, 2021
Reviewer Name / DateRamchandra Mogulla, March 12, 2021