Daily Field Report

Date :07/10/2021
Project No :2021C060
Client Company :Pulte Group
Arrival Time :07/06/2021 10:00
Onsite Hours :02:00
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :Partly Cloudy
Departure Time :07/06/2021 12:00
ASEC Technician Name :Christopher Burrow II

Observations/Finding

As requested, a ASEC technician was present at the above referenced site for the purpose of conducting a slab on grade and perimeter slab footing inspection and bearing testing for lot #6316

Slab appears to consist of #4 rebar rested on 3″ rod chairs spaced at approximately six 6″ inches on center. The bottom of the slab is covered with continuous poly vapor barrier lapping which wire mesh placed one 1″ from the bottom of slab. Slab preparations appear to be in accordance with project specifications. The footing evaluation was performed by visual inspection, hand probing and dynamic cone penetrometer (DCP) testing.

During the evaluation, well compacted fill soils were encountered underlain by residual soils. These soils were found to be capable of supporting the building structure utilizing an allowable soil bearing pressure of 2,000 psf. The footings are the proper depth and width and have been prepared in accordance with IRC 2012 and the Georgia Amendments. Lot #6316 is ready for concrete placement.

See attached DCP/Boring Sheet for full data.

The superintendent has been notified of these findings.

 

DCP LOCATION:
Lot #, North/South/Center etc
Lot 6316 North side DCP LOCATION:
Lot #, North/South/Center etc
Lot 6316 South side
Depth
(feet)
Set
2″
N
1.75″
Description Depth
(feet)
Set
2″
N
1.75″
Description
1 10 Red, Brown Silty SAND 1 10 Red, Brown Silty SAND
2 16 Red, Brown Silty SAND 2 18 Red, Brown Silty SAND
3 15 Tan, Brown, micaceous, Silty SAND 3 17 Tan, Brown, micaceous, Silty SAND
4 15 Tan, Brown, micaceous, Silty SAND 4 18 Tan, Brown, micaceous, Silty SAND
5 20+ Tan, Brown, micaceous, Silty SAND 5 20+ Brown Silty SAND with rock fragments
6 20+ Brown Silty SAND with rock fragments 6 3 offsets taken
7 3 offsets taken 7
Technician Signature / DateChristopher Burrow II, July 10, 2021
Reviewer Name / DateRamchandra Mogulla, November 18, 2021