- Density Test Report Report ID: 33592
- This project is inactive from admin.Download Report
Density Test Report
Date :08/29/2021
Project No :2021C070
Client Company :CCG Constructors LLC (Century)
Arrival Time :08/27/2021 09:15
Onsite Hours :05:00
Name of the Project :Harmony Heights
Project Location :Mt. Olive Road at Brentwood Drive, Commerce, GA
Weather :sunny
Departure Time :08/27/2021 14:15
ASEC Technician Name :Russell Hendrix
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
08/27/2021 | 1 | 20.7 | 90.4 | P-01 | 102.0 | 16.6 | 88.6 | 90 | D6938 | Fail |
Location : | Center (2nd phase), Elv/Depth : | |||||||||
Comment : | Gauge Serial No. :29588 | |||||||||
08/27/2021 | 2 | 22.3 | 91.9 | P-01 | 102.0 | 16.6 | 90.1 | 90 | D6938 | Pass |
Location : | Center (2nd phase) , Elv/Depth : | |||||||||
Comment : | Gauge Serial No. :29588 | |||||||||
08/27/2021 | 3 | 20 | 95.8 | P-01 | 102.0 | 16.6 | 93.9 | 90 | D6938 | Pass |
Location : | Center (2nd phase), Elv/Depth : | |||||||||
Comment : | Gauge Serial No. :29588 | |||||||||
4 | 19.1 | 92.1 | P-01 | 102.0 | 16.6 | 90.3 | 90 | D6938 | Pass | |
Location : | Center (2nd phase), Elv/Depth : | |||||||||
Comment : | This was a retest of #1 after compactor had re-compacted same area 20 times without adding soil. Suspect new proctor needed. | Gauge Serial No. :29588 |
Technician Signature / DateRussell Hendrix, August 29, 2021