Skip to content

Daily Field Report

Date :09/15/2021
Project No :2021C061
Client Company :Pulte Group
Arrival Time :09/15/2021 11:00
Onsite Hours :03:00
Name of the Project :Brighton
Project Location :1148 Forrest Ave, Fayetteville, GA 30214
Weather :Partly cloudy
Departure Time :09/15/2021 14:00
ASEC Technician Name :Christopher Burrow II

Observations/Finding

The above named ASEC technician was present at Brighton lot 23 for further inspections of the footings and soil underneath. During several hand auger holes dug to a maximum depth of 10’ it was determined that there is a layer of top soil not compliant with required bearing pressure that must either be removed or overcome by the placement of helical piers. The solution is in discussion with the contractors at this time.

The attached data sheet shows the soil consistency at each foot from 1’ to 10’ in depth.

Technician Signature / DateChristopher Burrow II, September 15, 2021
Reviewer Name / DateRamchandra Mogulla, November 18, 2021