Daily Field Report

Date :08/03/2021
Project No :2021C074
Client Company :DR Horton West
Arrival Time :08/03/2021 10:00
Onsite Hours :03:00
Name of the Project :Oakhurst Glen - Ph 4
Project Location :Mallord Drive, South Fulton, GA
Weather :Partly cloudy
Departure Time :08/03/2021 13:00
ASEC Technician Name :Christopher Burrow II

Observations/Finding

The undersigned ASEC Inspector was on site, on the above date, for the purpose of general site monitoring and assessment of contractor and subcontractor activities. The following are observations that were made at this time:

Concrete was tested on this date as it was poured into the forms for the retaining wall surrounding the retention pond. Below listed are the results of these tests.

Truck 1, 10 yds                                                                             Truck 5, 50 yds.

Temperature: 87 degrees                                                          Temperature: 88 degrees

Slump: 6 inches                                                                          Slump: 5.5 inches

Air content: 4.2                                                                           Air content: 4.1

Unit Weight: 144 lbs                                                                  Unit Weight: 145.1 lbs.

Ambient temperature: 77 degrees.                                         Ambient Temperature: 78 degrees

Technician Signature / DateChristopher Burrow II, August 3, 2021
Reviewer Name / DateRamchandra Mogulla, October 13, 2021