Skip to content

Density Test Report

Date :09/07/2021
Project No :2021C070
Client Company :CCG Constructors LLC (Century)
Arrival Time :09/07/2021 07:30
Onsite Hours :04:30
Name of the Project :Harmony Heights
Project Location :Mt. Olive Road at Brentwood Drive, Commerce, GA
Weather :cloudy
Departure Time :09/07/2021 12:00
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/07/2021 1 18.7 105.5 P-02 105.6 16.6 99.9 95 D6938 Pass
Location : Lot 23, Elv/Depth :840
Comment : Gauge Serial No. :29588
09/07/2021 2 20.3 127.3 P-02 105.6 16.6 100.2 95 D6938 Pass
Location : 24, Elv/Depth :840
Comment : Gauge Serial No. :29588
09/07/2021 3 19.6 104.2 P-02 105.6 16.6 98.7 95 D6938 Pass
Location : Lot 25, Elv/Depth :840
Comment : It was discussed with the Cat dozer operator about making smaller lifts . Initially the lift was 16", but was addressed and changed to 8" lifts. This was appropriate for the compactor BW211 PD-50. Gauge Serial No. :29588
09/07/2021 4 20.6 102.2 P-02 105.6 16.6 96.8 95 D6938 Pass
Location : Lot 23, Elv/Depth :844
Comment : Gauge Serial No. :29588
09/07/2021 5 20.3 107.0 P-02 105.6 16.6 101.3 95 D6938 Pass
Location : Lot 24, Elv/Depth :844
Comment : Gauge Serial No. :29588
09/07/2021 6 18.6 97.6 P-01 102.0 16.6 95.7 95 D6938 Pass
Location : Lot 25, Elv/Depth :846
Comment : Discussed with compactor Operator to make more passes in between lifts. Foreman was offsite at the time. Gauge Serial No. :29588
09/07/2021 7 21.6 98.0 P-01 102.0 16.6 96.1 95 D6938 Pass
Location : Lot 26, Elv/Depth :846
Comment : Started raining during this test. Operations ceased. Gauge Serial No. :29588
Technician Signature / DateRussell Hendrix, September 7, 2021
Reviewer Name / DateRamchandra Mogulla, November 18, 2021