Observations/Finding

The undersigned ASEC Inspector was on site, on the above date, for the purpose of general site monitoring and assessment of contractor and subcontractor activities. The following are observations that were made at this time:

-Excavation of Ancoats Street for the placement of drain pipe under the roadway.

-Backfill on retention pond drain pipe.

-Connecting retention pond drain to road drain.