Daily Field Report

Date :12/02/2021
Project No :2021C060
Client Company :Pulte Group
Arrival Time :11/30/2021 11:00
Onsite Hours :01:30
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :sunny
Departure Time :11/30/2021 12:30
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A visual inspection for reinforcing steel placement and foundation subgrade was requested for Lot #30.  All reinforcing steel was placed as per job specifications for size, spacing and quantity.  A probing of the footing area was suitable for concrete placement.  A DCP was also completed.  Please see the attached data.

DCP TEST DATA SHEET
                         
Project Name: Suncity   Date: 11/30/21
Project Number: Lot 30   Technician: Russ Hendrix
Project Location: Griffen, GA
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Footing   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   12 Red silty fine sand   1      
2   17 Red silty fine sand w/rock mix   2      
3   12 Red silty fine sand w/rock mix   3      
4   12 Dark Red silty Clay   4      
Technician Signature / DateRussell Hendrix, December 2, 2021
Reviewer Name / DateKenneth Mosman, December 15, 2021