Daily Field Report

Date :12/02/2021
Project No :2021C060
Client Company :Pulte Group
Arrival Time :11/30/2021 01:30
Onsite Hours :01:30
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :sunny
Departure Time :11/30/2021 03:00
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals.  Upon visiting the site (Lot #4), after a request for inspection, it was noted the footing reinforcing steel was not placed as per job specifications.  It was requested that all rebar be tied as well as all debris removed from slab area before concrete placement.  The footing was probed as well and a DCP performed and deemed suitable for concrete placement. Please see the attached data.

DCP TEST DATA SHEET
                         
Project Name: Suncity   Date: 11/30/21
Project Number: Lot 4   Technician: Russ Hendrix
Project Location: Griffin, GA
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Footing   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   18 Red silty fine sand   1      
2   16 Red silty fine sand   2      
3   15 Red silty fine sand   3      
4   16 Red silty fine sand   4      

Footing reinforcing steel was not tied to code.  It was requested that all rebar be tied as well as all debris removed from slab area prior to concrete placement.  The footing was probed as well as a DCP performed and deemed acceptable. Please see the attached data.

 

Technician Signature / DateRussell Hendrix, December 2, 2021
Reviewer Name / DateKenneth Mosman, December 15, 2021