Daily Field Report

Date :12/02/2021
Project No :2021C061
Client Company :Pulte Group
Arrival Time :11/30/2021 03:00
Onsite Hours :01:30
Name of the Project :Brighton
Project Location :1148 Forrest Ave, Fayetteville, GA 30214
Weather :sunny
Departure Time :11/30/2021 04:30
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on Lot #28 Brighton today:

Upon visual inspection it was requested that all organic material (leaves) and debris be removed from footing and slab areas before concrete placement.  Upon probing and DCP testing the footing was deemed suitable for concrete placement.

DCP TEST DATA SHEET
                         
Project Name: Brighton   Date: 11/30/21
Project Number: Lot 28   Technician: Russ Hendrix
Project Location:  
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Footing   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   20 Red silty fine sand        
2   16 Red silty fine sand        
3   14 Red silty fine sand        
4   14 Red silty fine sand        
Technician Signature / DateRussell Hendrix, December 2, 2021
Reviewer Name / DateKenneth Mosman, December 15, 2021