Daily Field Report

Date :01/20/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :01/12/2022 07:30
Onsite Hours :01:30
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :27, cold
Departure Time :01/12/2022 09:00
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

Upon arrive at Lot #73 it was noted that the rebar and forms were not completed on the south side of the home location.  A discussion was held with the foreman of the footing crew.  It was requested that upon completion pictures would be sent of the deficient area. These pictures were received later and our representative re-inspected.

Our inspection found rebar met job specification for size, quantity, and spacing.  The footing probed firm using a 3/8″ diameter probe rod.  A DCP test was conducted at the road frontage.  Please find the attached table for our results.

DCP TEST DATA SHEET
                         
Project Name: Suncity   Date: 01/20/22
Project Number: 2021c060   Technician: Russell Hendrix
Project Location: Griffin, GA
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Lot 73 expedition, Northeast at roadfront   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   7 Red fine sandy silt   1      
2   11 Red fine sandy silt   2      
3   11 Red fine sandy silt   3      
4   13 Light brown fine sandy silt   4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
                         
DCP LOCATION:
Lot #, North/South/Center etc
    DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1         1      
2         2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
NOTES:  
 
 

 

Technician Signature / DateRussell Hendrix, January 20, 2022
Reviewer Name / DateKenneth Mosman, January 24, 2022