Daily Field Report

Date :01/20/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :01/14/2022 08:00
Onsite Hours :02:00
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :sunny 38
Departure Time :01/14/2022 10:00
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

An inspection was completed on Lot #39, Pod 17 in the Pinnacle section of Suncity.  Rebar was observed to be placed correctly for size, spacing, and quantity.  Two DCPs were conducted on the Northeast side at the road frontage. Previously, it was discussed with Robert the foreman of the concrete crew that if a rain/ice event happens the footings would need to be de-mucked prior to concrete placement.  A rain/ice event did happen before concrete was placed.  Robert stated the footing had been de-mucked, but there was no reinspection.

 

Please see the attached table.

DCP TEST DATA SHEET
                         
Project Name: Suncity   Date: 01/14/22
Project Number: 2021c060   Technician: Russ Hendrix
Project Location: Suncity, Griffin
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Lot 39 Pinnacle, pod 17 facing road   DCP LOCATION:
Lot #, North/South/Center etc
Lot 39 Northwest, side
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   11 Red fine sandy silt   1   9 Red fine sandy silt
2   11 Black fine sandy clay w small amount organic   2   12 Black fine sandy clay w small amount organic
3   10 Red fine sandy silt   3   14 Red fine sandy clay
4   15 Red fine sandy silt   4   15 Red fine sandy silt
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
                         
DCP LOCATION:
Lot #, North/South/Center etc
    DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1         1      
2         2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
NOTES:  
 
Technician Signature / DateRussell Hendrix, January 20, 2022
Reviewer Name / DateKenneth Mosman, January 24, 2022