Skip to content

Daily Field Report

Date :02/03/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :01/18/2022 13:00
Onsite Hours :01:00
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :43
Departure Time :01/18/2022 14:00
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

Upon arrival, for Lot #38 Pod 17 it was observed that all rebar was placed as per job specifications for size, spacing, and quantity.  The previous days freezing rain caused accumulation of two (2) inches of muck in the bottom of the footing.  Our representative recommended demucking the footing to remove deleterious materials.  Dynamic Cone Penetrometer Testing (DCP) were performed.  Footings were found to have a soil bearing pressure of 2,500 psf.  Please see the attached table.

DCP TEST DATA SHEET
                         
Project Name: suncity   Date: 01/18/22
Project Number: 2021c060   Technician: Russ Hendrix
Project Location: Griffin, GA
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Lot 38 Pod 17, Southeast footing   DCP LOCATION:
Lot #, North/South/Center etc
Lot 38 offset
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   10 Red fine sandy silt   1     Red fine sandy silt
2   16 Red fine sandy silt   2   AR Red fine sandy silt
3   ar     3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
                         
DCP LOCATION:
Lot #, North/South/Center etc
    DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1         1      
2         2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
NOTES:  
 
 

 

Technician Signature / DateRussell Hendrix, February 3, 2022
Reviewer Name / DateKenneth Mosman, February 15, 2022