Density Test Report

Date :01/13/2022
Project No :2022C109
Client Company :CWM
Arrival Time :01/13/2022 08:00
Onsite Hours :04:00
Name of the Project :Asphalt Plant, Dalton
Project Location :Dalton
Weather :Clear and Cold
Departure Time :01/13/2022 12:00
ASEC Technician Name :Timothy Nevills

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/13/2022 1 3.8 146.2 P-01 150.7 7.4 97.0 95.0 D6938 Pass
Location : near SE corner of silo pad, Elv/Depth :-4 feet below FSG
Comment : Test performed at 6" depth into a 12" layer of graded aggregate base (GAB) Gauge Serial No. :30942
01/13/2022 2 2.9 148.0 P-01 150.7 7.4 98.2 95 D6938 Pass
Location : near SW corner of silo pad, Elv/Depth :-4 feet below FSG
Comment : Test performed at 6" depth into a 12" layer of graded aggregate base (GAB) Gauge Serial No. :30942
01/13/2022 3 2.7 147.0 P-01 150.7 7.4 97.5 95 D6938 Pass
Location : near NE corner of silo pad, Elv/Depth :-4 feet below FSG
Comment : Test performed at 6" depth into a 12" layer of graded aggregate base (GAB) Gauge Serial No. :30942
01/13/2022 4 3.0 147.4 P-01 150.7 7.4 97.8 95 D6938 Pass
Location : near NW corner of silo pad, Elv/Depth :-4 feet below FSG
Comment : Test performed at 6" depth into a 12" layer of graded aggregate base (GAB) Gauge Serial No. :30942
Technician Signature / DateKenneth Mosman, January 13, 2022
Reviewer Name / DateRamchandra Mogulla, March 11, 2022