Date :02/07/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :02/07/2022
Onsite Hours :
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :52
Departure Time :02/07/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

Upon arrival it was observed a water line was being installed in the right of way that crossed the entrance to the project.  An approximately 1 foot x 1 foot section underneath the previously placed concrete curbing at the outside entrance radius was required to have all soil support removed temporarily.

A discussion was held with Chris of Charles Pruitt company in regard to the use of topsoil on the project.  It was recommended that topsoil only be placed on slopes and at least 5 feet away from any proposed structures (in landscaped areas).

 

Technician Signature / DateRussell Hendrix, February 7, 2022
Reviewer Name / DateRamchandra Mogulla, December 12, 2022