Daily Field Report

Date :02/09/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :02/09/2022
Onsite Hours :
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :59 sunny
Departure Time :02/09/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A site visit was made to obtain samples to return to our laboratory to perform moisture-density relationships (proctors).  Working with Brad, the grading foreman on materials obtained from off-site borrow, two (2) proctor samples were taken from the largest ridge on site (approximately Station 9+00 at the proposed road).   An excavation approximately 12 feet deep was made.

It was observed that the retaining wall footing in back of project had not been inspected due to short notice/scheduling conflict.  A previous request was made on the phone with Josh the wall foreman to make 6 cylinders; however, no cylinders were made.

Technician Signature / DateRussell Hendrix, February 9, 2022
Reviewer Name / DateRamchandra Mogulla, December 12, 2022