Daily Field Report

Date :02/24/2022
Project No :2020C007
Client Company :Pulte Group
Arrival Time :02/10/2022
Onsite Hours :
Name of the Project :Winslow at Brookstone
Project Location :6156 Collins Road, Acworth, GA 30101
Weather :61 sunny
Departure Time :02/10/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A footing inspection was requested for Lot #34 in Winslow @ Brookstone.  Upon arrival all rebar was found to meet job specifications for size, spacing, and quantity.  Dynamic Cone Penetrometer (DCP) testing found the footing to be suitable for a soil bearing pressure of 2000 psf.  Please see the following table below for results.

DCP TEST DATA SHEET
                         
Project Name: Winslow at Brookstone   Date: 02/10/22
Project Number: 2020c007   Technician: Russ Hendrix
Project Location: Subdivision, lot 34
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Footing, East, facing road   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   9 Red fine sandy silt   1      
2   14 Red fine sandy silt   2      
3   9 Gray silty fine sand   3      
4   9 Gray silty fine sand   4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
                         
DCP LOCATION:
Lot #, North/South/Center etc
    DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1         1      
2         2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
NOTES:  
 
 
Technician Signature / DateRussell Hendrix, February 24, 2022
Reviewer Name / DateKenneth Mosman, March 02, 2022