Daily Field Report

Date :03/03/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :03/03/2022
Onsite Hours :
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :76 sunny
Departure Time :03/03/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A call was received from Brent the project manager from Century Homes, Inc.  A large burn pit (organics) was discovered in the general location of A11 near the detention pond.  This pit had a mix of organic material with tree parts.  The complete pit size was undetermined as they are continuing to excavate materials.  As this material was being removed a large amount of water surged in from the excavation.

This pit was encountered as they were installing corrugated HDPE pipe that drains to the detention pond.  The pipe was bedded on a 6-inch base of #57 stone.  This was continued from A11 to the detention pond.

 

 

 

 

Technician Signature / DateRussell Hendrix, March 3, 2022
Reviewer Name / DateRamchandra Mogulla, December 12, 2022