Skip to content

Daily Field Report

Date :03/31/2022
Project No :2020C007
Client Company :Pulte Group
Arrival Time :03/07/2022
Onsite Hours :
Name of the Project :Winslow at Brookstone
Project Location :6156 Collins Road, Acworth, GA 30101
Weather :60 cloudy
Departure Time :03/07/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A request for inspection was made for Lot #38 at Winslow at Brookstone.  Footings were found to meet the job specification of 2000 psf.  All rebar was observed to be placed as per job specifications for size, spacing, and quantity.  Please find attached table:

DCP TEST DATA SHEET
                         
Project Name: Winslow @ Brookstone   Date: 03/07/22
Project Number: 2020C007   Technician: Russ Hendrix
Project Location: Acworth
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Lot 38, back corner   DCP LOCATION:
Lot #, North/South/Center etc
Off set
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   AR Red clay silt   1   AR hit rock
2     (hit rock)   2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
                         
DCP LOCATION:
Lot #, North/South/Center etc
off set, back center of footing   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   7 Red clay silt   1      
2   6 Brown silty fine sand   2      
3   7 Brown silty fine sand   3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
NOTES:  
 
 
Technician Signature / DateRussell Hendrix, March 31, 2022
Reviewer Name / DateKenneth Mosman, April 02, 2022