Skip to content

Density Test Report

Date :03/15/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :03/15/2022
Onsite Hours :
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :50 sunny
Departure Time :03/15/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/15/2022 1 20.6 79.0 P-5 102.4 17.8 77.1 95 D6938 Fail
Location : Sta 1+50 (Lot #1), Elv/Depth :958
Comment : Wet soils require removal, disking and aeration prior to replacment and recompaction Gauge Serial No. :38069
03/15/2022 2 31.9 68.8 P-5 102.4 17.8 67.2 95 D6938 Fail
Location : Sta 2+00 (Lot #36), Elv/Depth :final grade
Comment : Wet soils require removal, disking and aeration prior to replacment and recompaction Gauge Serial No. :38069
03/15/2022 3 29.3 66.5 P-5 102.4 17.8 64.9 95 D6938 Fail
Location : Sta 2+25 (Lot #2), Elv/Depth :956
Comment : Wet soils require removal, disking and aeration prior to replacment and recompaction Gauge Serial No. :38069
03/15/2022 4 25.9 75.9 P-5 102.4 17.8 74.1 95 D6938 Fail
Location : Sta 1+50 (Lot #1), Elv/Depth :960
Comment : Wet soils require removal, disking and aeration prior to replacment and recompaction Gauge Serial No. :38069
03/15/2022 5 25. 71.2 P-4 0 Infinity D6938 Pass
Location : Sta 2+50 (Lot #2), Elv/Depth :958
Comment : Gauge Serial No. :38069
Technician Signature / DateRussell Hendrix, March 15, 2022
Reviewer Name / DateRamchandra Mogulla, December 12, 2022