Daily Field Report

Date :03/22/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :03/22/2022
Onsite Hours :
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :60 sunny
Departure Time :03/22/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

Upon arrival a meeting was held with Brad the grading foreman from George Pruitt, Inc.  An additional organics pit (see previous reports) was located that included organic material mostly consisting of trees.  The pit was excavated with the material relocated to another location on the East side of the site.  The pit measured approximately 11 feet x 60 feet x 14 feet deep.

Technician Signature / DateRussell Hendrix, March 22, 2022
Reviewer Name / DateRamchandra Mogulla, December 12, 2022