- Home
- Daily Field Report Report ID: 53459
- Edit Download Report
Daily Field Report
Date :03/31/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :03/24/2022
Onsite Hours :
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :70 sunny
Departure Time :03/24/2022
ASEC Technician Name :Russell Hendrix
Observations/Finding
The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
A request was made for a footing inspection for Lots #34 Pod #17. All rebar was placed as per job specifications for size, quantity, and spacing. The footing probed firm with a 3/8-inch rod. Please see the attached table.
DCP TEST DATA SHEET | ||||||||||||
Project Name: | Suncity | Date: | 03/24/22 | |||||||||
Project Number: | 2021c060 | Technician: | Russ Hendrix | |||||||||
Project Location: | Griffin | |||||||||||
DCP LOCATION: Lot #, North/South/Center etc |
Lot 34/pod 17 footing | DCP LOCATION: Lot #, North/South/Center etc |
||||||||||
Depth (feet) |
Set 2″ |
N 1.75″ |
Description | Depth (feet) |
Set 2″ |
N 1.75″ |
Description | |||||
1 | 13 | Red fine sandy silt | 1 | AR | Red fine sandy silt | |||||||
2 | AR | 2 | ||||||||||
3 | 3 | |||||||||||
4 | 4 | |||||||||||
5 | 5 | |||||||||||
6 | 6 | |||||||||||
7 | 7 | |||||||||||
8 | 8 | |||||||||||
9 | 9 | |||||||||||
10 | 10 | |||||||||||
DCP LOCATION: Lot #, North/South/Center etc |
off set, back center of footing | DCP LOCATION: Lot #, North/South/Center etc |
||||||||||
Depth (feet) |
Set 2″ |
N 1.75″ |
Description | Depth (feet) |
Set 2″ |
N 1.75″ |
Description | |||||
1 | 1 | |||||||||||
2 | 2 | |||||||||||
3 | 3 | |||||||||||
4 | 4 | |||||||||||
5 | 5 | |||||||||||
6 | 6 | |||||||||||
7 | 7 | |||||||||||
8 | 8 | |||||||||||
9 | 9 | |||||||||||
10 | 10 | |||||||||||
NOTES: | ||||||||||||
Technician Signature / DateRussell Hendrix, March 31, 2022
Reviewer Name / DateKenneth Mosman, April 02, 2022