Daily Field Report

Date :03/31/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :03/30/2022
Onsite Hours :
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :65 sunny
Departure Time :03/30/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A request was made to test lifts for the earthen lake dam on Barnett Shoals Road.  Three lifts approximately 10-12 inches thick were placed and completed with a Yancy CP3 sheeps-foot compactor and a Komatsu 51PX dozer.  The dam area measured approximately 55 feet x 85 feet.

A 3/8-inch probe rod was used and displayed a penetration depth of 6 to 12 inches.  A discussion with Ram Mogulla, Principal Enigneer with ASEC resulted in a request to have the compactor re-roll the entire area several times.

Please see the attached density report for Nuclear Gauge testing results.

Technician Signature / DateRussell Hendrix, March 31, 2022
Reviewer Name / DateKenneth Mosman, April 02, 2022