Skip to content

Daily Field Report

Date :04/12/2022
Project No :2021C058
Client Company :Pulte Group
Arrival Time :04/12/2022 11:00
Onsite Hours :02:00
Name of the Project :Parkside at Mason Mill
Project Location :Decatur, GA
Weather :
Departure Time :04/12/2022 13:00
ASEC Technician Name :Jamal Geathers

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals.

Our ASEC representative performed foundation bearing tests on the below referenced footing areas.  All referenced footings were found to meet job specifications for a soil bearing pressure of 2,000 psf.

A reinforcing steel inspection was performed on the following locations: (Lots #157- 160).  Reinforcing steel was observed to meet job specifications for required size, spacing, and quantity. No discrepancies were noted.

If foundation soils become wet prior to concrete placement, they should be reevaluated by a geotechnical engineer or qualified soils technician. All loose and soft soils or debris should be removed from foundations prior to concrete placement.

DCP LOCATION:
Lot #, North/South/Center etc
160 DCP LOCATION:
Lot #, North/South/Center etc
159
Depth
(feet)
Set
2″
N
1.75″
Description Depth
(feet)
Set
2″
N
1.75″
Description
1 5 16 1 5 11
2 5 7 2 5 12
3 5 12 3 5 14
4 5 10 4 5 11
5 5
6 6
7 7
8 8
9 9
10 10
DCP LOCATION:
Lot #, North/South/Center etc
lot 158 DCP LOCATION:
Lot #, North/South/Center etc
lot 157
Depth
(feet)
Set
2″
N
1.75″
Description Depth
(feet)
Set
2″
N
1.75″
Description
1 5 10 1 5 7
2 5 9 2 5 10
3 5 auger refusal 3 5 8
4 5 4 5 7
Technician Signature / DateJamal Geathers, April 12, 2022
Reviewer Name / DateKenneth Mosman, April 24, 2022