Skip to content

Density Test Report

Date :04/08/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :04/08/2022 09:00
Onsite Hours :9:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :60 Degree's
Departure Time :04/08/2022 18:00
ASEC Technician Name :Rasheen Biggins

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/08/2022 1 29.4 93.1 P-1 97.3 23.7 95.7 95.6 D6938 Pass
Location : Soil Bridge , Elv/Depth :
Comment : Gauge Serial No. :38069
04/08/2022 2 31.2 91.3 P-1 97.3 23.7 93.8 93.8 D6938 Fail
Location : Soil Bridge, 15ft Away from 1st Test, Elv/Depth :
Comment : Moisture content needs to be reduced before recomaction Gauge Serial No. :38069
04/08/2022 3 30.7 94.8 P-1 97.3 23.7 97.4 97.4 D6938 Fail
Location : Soil Bridge, 15ft away from 2nd test, Elv/Depth :
Comment : Gauge Serial No. :38069
Technician Signature / DateRasheen Biggins, April 8, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022