Daily Field Report
Observations/Finding
The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today
Upon arrival to the site, our representative observed that work was already in progress for dam fill placement. A CAT bulldozer spread fill material brought by two CAT dump trucks and compacted with a CAT 825K landfill compactor. Density tests were performed and are attached. Based on the density test results, visual observation of the material placed and random probing of the placed lifts, the fill placed was found to be acceptable as per job specifications.
All density tests were reported to Morris (contractor). A nuclear density gauge model 3430, Serial Number 38069 was used.