Skip to content

Density Test Report

Date :04/11/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :04/11/2022 08:30
Onsite Hours :9:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :60 Degrees
Departure Time :04/11/2022 17:30
ASEC Technician Name :Rasheen Biggins

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/11/2022 1 33.5 87.6 P-1 97.3 23.7 90.0 95 D6938 Fail
Location : Soil Bridge , Elv/Depth :
Comment : Results reported to the contractor. Recompaction is required. Gauge Serial No. :38069
04/11/2022 2 29.9 93.0 P-1 97.3 23.7 95.6 95 D6938 Pass
Location : Soil bridge , Elv/Depth :
Comment : Gauge Serial No. :38069
04/11/2022 3 28.4 92.7 P-1 97.3 23.7 95.3 95 D6938 Pass
Location : Soil bridge , Elv/Depth :
Comment : Gauge Serial No. :38069
04/11/2022 4 26.3 94.9 P-1 97.3 23.7 97.5 95 D6938 Pass
Location : Soil Bridge , Elv/Depth :
Comment : Gauge Serial No. :38069
04/11/2022 5 26.3 96.4 P-1 97.3 23.7 99.1 95 D6938 Pass
Location : Soil Bridge , Elv/Depth :
Comment : Gauge Serial No. :38069
04/11/2022 6 30.8 91.6 P-1 97.3 23.7 94.1 95 D6938 Fail
Location : Soil Bridge , Elv/Depth :
Comment : Results reported to the contractor. Recompaction is required. Gauge Serial No. :38069
04/11/2022 7 28.0 96.1 P-1 97.3 23.7 98.8 95 D6938 Pass
Location : Soil Bridge , Elv/Depth :
Comment : Gauge Serial No. :38069
Technician Signature / DateRasheen Biggins, April 11, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022