Date :05/04/2022
Project No :2021C058
Client Company :Pulte Group
Arrival Time :05/04/2022 14:00
Onsite Hours :00:30
Name of the Project :Parkside at Mason Mill
Project Location :Decatur, GA
Weather :Sunny
Departure Time :05/04/2022 14:30
ASEC Technician Name :Vidal Dias

Observations/Finding

AS Engineering and Consulting, LLC. has completed an engineering evaluation of the basement wall/stem wall footing for Lots #157 through 160 at Parkside at Mason Mill. Measurements were taken to ensure the horizontal and vertical rods were properly spaced to meet the designated specifications on the drawings.

Lots 156 to 160 a

Lots 156 to 160 b

Technician Signature / DateVidal Dias, May 4, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022