Daily Field Report

Date :05/23/2022
Project No :2021C078
Client Company :CCG Constructors LLC (Century)
Arrival Time :05/05/2022
Onsite Hours :
Name of the Project :Pickens Landing Development
Project Location :Dacula, GA
Weather :sunny
Departure Time :05/05/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the AS Engineering and Consulting (ASEC) representative noted above for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
Upon arrival it was observed that soils unsuitable for use as structural fill were being placed (wasted) to all available slopes on the Pickens Landing project site (see photo).  No other work was being performed.
Equipment used:  PC350 Komatsu excavator, Komatsu off road dump truck, Komatsu 39PX Bulldozer.

Unsuitable soil being removed from stockpile and distributed to slopes

Technician Signature / DateRussell Hendrix, May 23, 2022
Reviewer Name / DateKenneth Mosman, June 05, 2022