Daily Field Report

Date :05/23/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :05/11/2022
Onsite Hours :
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :sunny
Departure Time :05/11/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the AS Engineering and Consulting (ASEC) representative noted above for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:
Equipment used: Caterpillar CP3 Compactor, Komatsu 51PX Bulldozer, Volvo off-road dump trucks x 2, Caterpillar Excavator.
Upon arrival it was observed that fill lifts were being placed and compacted on the north and south sections of the lake dam.  Two (2) lifts were placed (no elevation was available) and several density tests were performed (see attached report).  The second lift required scarification and aeration to lower in-situ soil moisture contents.   A final test was not completed.

North and South section of the dam being compacted.

Technician Signature / DateRussell Hendrix, May 23, 2022
Reviewer Name / DateKenneth Mosman, June 05, 2022