Daily Field Report

Date :04/29/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :04/29/2022 10:30
Onsite Hours :06:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :69
Departure Time :04/29/2022 16:30
ASEC Technician Name :Rasheen Biggins

Observations/Finding

The site was visited by Rasheen Biggins, AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today

Upon arrival, our ASEC representative observed work was already in progress. The contractor was placing fill and compacting soils around a pipeline, alongside the dam area. Random probing performed one (1) foot away from pipeline found the soils to be loose up to 1.5 feet.  Our representative recommended Morris (Contractor) to begin removing two (2) feet of wet soils and replacing with drier materials on each side of the pipeline. The length of the remediated area was measured at 57 feet in length on the left side of the pipe and 33 feet in length on the right side of the pipe. Once remediation was completed, the contractor began backfilling in lifts, and spread by a cat excavator.  Compaction was performed with a Wacker packer. Density tests were done with Troxler #38069 and can be found in the attached density report.

 

Technician Signature / DateRasheen Biggins, April 29, 2022
Reviewer Name / DateKenneth Mosman, July 03, 2022