Density Test Report

Date :04/29/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :04/29/2022 10:30
Onsite Hours :06:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :66 Degree's, Sunny
Departure Time :04/29/2022 16:30
ASEC Technician Name :Rasheen Biggins

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/29/2022 1 28.0 127.4 P-1 97.3 23.7 130.9 95 D6938 Pass
Location : pipeline along the dam area, Elv/Depth :finished grade
Comment : Mixture of soil types in this area most likely not matching a project moisture-density relationship (proctor) Gauge Serial No. :38069
04/29/2022 2 18.3 105.7 P-1 97.3 23.7 108.6 95 D6938 Pass
Location : pipeline along the dam area, Elv/Depth :finished grade
Comment : Mixture of soil types in this area most likely not matching a project moisture-density relationship (proctor) Gauge Serial No. :38069
04/29/2022 3 16.9 107.8 P-1 97.3 23.7 110.8 95 D6938 Pass
Location : pipeline along the dam area, Elv/Depth :finished grade
Comment : Mixture of soil types in this area most likely not matching a project moisture-density relationship (proctor) Gauge Serial No. :38069
04/29/2022 4 18.1 106.1 P-1 97.3 23.7 109.0 95 D6938 Pass
Location : pipeline along the dam area, Elv/Depth :finished grade
Comment : Mixture of soil types in this area most likely not matching a project moisture-density relationship (proctor) Gauge Serial No. :38069
Technician Signature / DateRasheen Biggins, April 29, 2022
Reviewer Name / DateKenneth Mosman, July 03, 2022