Daily Field Report

Date :04/30/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :04/30/2022 07:30
Onsite Hours :05:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :
Departure Time :04/30/2022 12:30
ASEC Technician Name :Rasheen Biggins

Observations/Finding

The site was visited by Rasheen Biggins AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today.

Upon arrival to the site, project work was already in progress. The contractor was removing soft/wet soils from the left side of the pipeline according to recommendations made on 4/29/2022 (see daily field report for that day). The contractor then continued placing thin lifts (around 6 inches thick).  Random density testing and probing found the area to be suitable for continued fill placement.   All test results were reported back to Morris (contractor) and can be found in the attached density report.

Technician Signature / DateRasheen Biggins, April 30, 2022
Reviewer Name / DateKenneth Mosman, July 04, 2022