Date :05/06/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :05/06/2022 08:00
Onsite Hours :04:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :
Departure Time :05/06/2022 12:00
ASEC Technician Name :Rasheen Biggins

Observations/Finding

The site was visited by Rasheen Biggins AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today.

Upon arrive, our representative observed that work was already in progress.  The contractor was continuing to place fill along the dam area. A CAT bulldozer spread fill materials brought by two CAT Dump trucks and was compacted using a CAT 825K Landfill compactor. Density tests were performed on the fill placed. Based on the density test results, visual observation of the material lift thickness placement, and random probing of the placed lifts following compaction testing, the fill placed was found to be meet jobs specifications for compaction and stability. Results of density testing are attached.

Technician Signature / DateRasheen Biggins, May 6, 2022
Reviewer Name / DateKenneth Mosman, July 03, 2022