Density Test Report

Date :05/05/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :05/05/2022 08:00
Onsite Hours :04:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :
Departure Time :05/05/2022 12:00
ASEC Technician Name :Rasheen Biggins

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/05/2022 1 25.5 104.5 P-1 97.3 23.7 107.4 95 D6938 Pass
Location : within the dam area, Elv/Depth :below finished grade
Comment : Soils placed in this area may be a mixture of several different moisture-density relationships (proctors) Gauge Serial No. :38069
05/05/2022 2 23.9 104.0 P-1 97.3 23.7 106.9 95 D6938 Pass
Location : within the dam area, Elv/Depth :below finished grade
Comment : Soils placed in this area may be a mixture of several different moisture-density relationships (proctors) Gauge Serial No. :38069
05/05/2022 3 22.1 108.2 P-1 97.3 23.7 111.2 95 D6938 Pass
Location : within the dam area, Elv/Depth :below finished grade
Comment : Soils placed in this area may be a mixture of several different moisture-density relationships (proctors) Gauge Serial No. :38069
05/05/2022 4 23.0 108.0 P-1 97.3 23.7 111.0 95 D6938 Pass
Location : within the dam area, Elv/Depth :below finished grade
Comment : Soils placed in this area may be a mixture of several different moisture-density relationships (proctors) Gauge Serial No. :38069
05/05/2022 5 22.4 108.8 P-1 97.3 23.7 111.8 95 D6938 Pass
Location : within the dam area, Elv/Depth :below finished grade
Comment : Soils placed in this area may be a mixture of several different moisture-density relationships (proctors) Gauge Serial No. :38069
Technician Signature / DateRasheen Biggins, May 5, 2022
Reviewer Name / DateKenneth Mosman, July 04, 2022