Skip to content

Daily Field Report

Date :05/05/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :05/06/2022 12:00
Onsite Hours :05:30
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :
Departure Time :05/06/2022 17:30
ASEC Technician Name :Rasheen Biggins

Observations/Finding

The site was visited by Rasheen Biggins AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today.

Upon arrival to the project site, our representative observed work was already in progress and close to completion. The contractor continued placing fill along the dam area with each lift placed between 6-8 inches in thickness.   A CAT bulldozer spread these materials brought by two CAT Dump trucks which were compacted using a CAT 825K landfill compactor. Density tests were performed on the fill placed. Based on the density test results, visual observation of the material placed and random probing of the placed lifts, the fill placed was found to meet job specifications for soil compaction.  Test results can be found in the attached density test report.  The contractor was notified of the results.

Technician Signature / DateRasheen Biggins, May 5, 2022
Reviewer Name / DateKenneth Mosman, July 04, 2022