Skip to content

Daily Field Report

Date :05/12/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :05/12/2022 08:00
Onsite Hours :9:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :
Departure Time :05/12/2022 17:00
ASEC Technician Name :Rasheen Biggins

Observations/Finding

The site was visited by Rasheen Biggins AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today

Upon arrival to the project site, our representative observed that work was already in progress. The contractor continued placing fill for the dam.  Each lift was observed to be placed in 6-to-8-inch thickness. A CAT bulldozer spread fill materials brought by two CAT Dump trucks and compacted with a CAT 825K landfill compactor. Density tests were performed on the fill placed. Based on the density test results, visual observation of the material placed and random probing of the placed lifts, the fill was found to meet job specifications for compaction. Density test results can be found in the attached density report.

Technician Signature / DateRasheen Biggins, May 12, 2022
Reviewer Name / DateKenneth Mosman, July 10, 2022