Daily Field Report
Observations/Finding
The site was visited by Rasheen Biggins AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today
Upon arrival to the project site, our representative observed that work was already in progress. The contractor continued placing fill for the dam. Each lift was observed to be placed in 6-to-8-inch thickness. A CAT bulldozer spread fill materials brought by two CAT Dump trucks and compacted with a CAT 825K landfill compactor. Density tests were performed on the fill placed. Based on the density test results, visual observation of the material placed and random probing of the placed lifts, the fill was found to meet job specifications for compaction. Density test results can be found in the attached density report.