Density Test Report

Date :09/03/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :09/03/2022 06:30
Onsite Hours :-5:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :Overcast
Departure Time :09/03/2022 01:30
ASEC Technician Name :Nick Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/03/2022 1 20.4 107.0 15 107.9 17.9 99.2 90 D6938 Pass
Location : E Line 20 ft west of E2.1, Elv/Depth :988
Comment : Gauge Serial No. :29588
09/03/2022 2 23.4 100.0 15 107.9 17.9 92.7 95 D6938 Fail
Location : Localizer Pad, Elv/Depth :1011.08
Comment : Gauge Serial No. :29588
Technician Signature / DateNick Smith, September 3, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022