Date :09/03/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :09/03/2022 06:30
Onsite Hours :07:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :Overcast
Departure Time :09/03/2022 13:30
ASEC Technician Name :Nick Smith

Observations/Finding

As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on site this day.

Site Observations:

  • Density testing was performed using a Troxler nuclear gauge ( #3430, serial #29588).
  • Placement of fill was tested on E-line between E1 and E2.1and the results are attached in the Density Report.
  • Placement of fill was tested on Localizer Pad and the results are attached in the attached Density Test Report. Moisture was too high and compaction was low, contractor did not perform any work in the area.
  • Settlement plate on the Localizer pad was run into and had to be repaired.

 

Technician Signature / DateNick Smith, September 3, 2022
Reviewer Name / DateRamchandra Mogulla, September 07, 2022