Density Test Report

Date :08/02/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :09/02/2022 06:30
Onsite Hours :
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :
Departure Time :09/06/2022
ASEC Technician Name :Nick Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/02/2022 1 9.7 111.7 3 118.8 13.0 94.0 90 D6938 Pass
Location : Localizer, Elv/Depth :1006.5
Comment : Gauge Serial No. :29588
08/02/2022 2 10.0 110.6 3 118.8 13.0 93.1 90 D6938 Pass
Location : Localizer, Elv/Depth :1006.5
Comment : Gauge Serial No. :29588
08/02/2022 3 16.2 106.0 3 118.8 13.0 89.2 90 D6938 Fail
Location : Taxiway Station 440+00, Elv/Depth :
Comment : Moisture too high and requires re-compaction Gauge Serial No. :29588
Technician Signature / DateNick Smith, August 2, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022