As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Site Observations:
Localizer pad: Placement of structural fill was tested and the results are presented in the attached Density test report.
Contractor requested a proof roll evaluation of area within taxiway shoulder station 439+50 to 441+00. Proof roll was performed using a 740b, off road truck. Proof passed and was found acceptable.
Contractor requested a proof roll evaluation of area located south of the localizer pad receiving approved boulder fill material. Proof roll was performed using a 740b, off road truck. Proof passed and was found acceptable.

Proofrolling area within taxiway shoulder station 439+50 to 441+00

Proofrolling area south of the localizer pad receiving approved boulder fill material