Daily Field Report

Date :08/02/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :08/02/2022 06:30
Onsite Hours :
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :
Departure Time :
ASEC Technician Name :Nick Smith

Observations/Finding

As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Site Observations:

Localizer pad: Placement of structural fill  was tested and the results are presented in the attached Density test report.
Contractor requested a proof roll evaluation of area within taxiway shoulder station 439+50 to 441+00. Proof roll was performed using a 740b, off road truck. Proof passed and was found acceptable.

Contractor requested a proof roll evaluation of area located south of the localizer pad receiving approved boulder fill material. Proof roll was performed using a 740b, off road truck. Proof passed and was found acceptable.

 

 

Proofrolling area within taxiway shoulder station 439+50 to 441+00

Proofrolling area south of the localizer pad receiving approved boulder fill material

Technician Signature / DateNick Smith, August 2, 2022
Reviewer Name / DateRamchandra Mogulla, September 14, 2022