Skip to content

Daily Field Report

Date :09/09/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :09/09/2022 8:30
Onsite Hours :04:30
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :cloudy
Departure Time :09/09/2022 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, our ASEC technician was present at the above referenced site for the purpose of observing construction of the dam area. 
The dam area evaluation was performed by visual inspection and hand probing testing.

During the evaluation, the soils were found to be soft, muddy and with some organics.  Mr. Ram Mogulla of ASEC recommended removing about 3 feet of these organic-laden soils to reach residual (natural) soils. At this time, the dam was not ready for the replacement of the new soils.

See attached pictures.

Technician Signature / DateAminullah Azimi, September 9, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022