Daily Field Report
Date :09/16/2022
Project No :2021C082
Client Company :CCG Constructors LLC (Century)
Arrival Time :09/16/2022 12:30
Onsite Hours :03:00
Name of the Project :Estates at Old Friendship
Project Location :Buford, GA
Weather :Sunny
Departure Time :09/16/2022 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Our ASEC representative arrived on site, as requested, and observed:
The proof-roll of Friendship Falls Way from STA 17+00 to STA 23+00 and Friendship Creek Drive from STA 0+00 to STA 10+87.5.
The existing subgrade in both roadways appeared to be at finished grade elevation based on the information provided by grading contractor,
A fully loaded tandem axle truck was used to proof-roll the above-mentioned subgrades with multiple parallel and perpendicular passes across the area.
No severe pumping and/or deflection was observed during the proof-rolling of both areas.
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_135752-scaled.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_132756-scaled.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_132442-scaled.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_132118-scaled.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_131938-scaled.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/Screenshot_20220917-170948_Adobe-Acrobat-1.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_132409-scaled.jpg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2022/09/20220916_135752-scaled.jpg)
Technician Signature / DateAminullah Azimi, September 16, 2022