Date :09/19/2022
Project No :2021C082
Client Company :CCG Constructors LLC (Century)
Arrival Time :09/19/2022 9:00
Onsite Hours :03:00
Name of the Project :Estates at Old Friendship
Project Location :Buford, GA
Weather :cloudy
Departure Time :09/19/2022 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Our ASEC representative arrived on site, as requested, to observe:

Proof-rolling of the subgrade for Friendship Falls Way from STA 0+00 to STA 17+00.  The existing subgrade appeared to be at finished grade elevation based on the information providing by the grading contractor,

A fully loaded tendon axle dump truck was used to proof-roll the above the mentioned subgrade with multiple parallel and perpendicular passes across the area.

No severe pumping and/or deflection were observed during the proof-roll at the above mentioned area.

Technician Signature / DateAminullah Azimi, September 19, 2022
Reviewer Name / DateKenneth Mosman, February 16, 2023