Daily Field Report

Date :09/20/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :09/20/2022 9:00
Onsite Hours :03:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :sunny
Departure Time :09/20/2022 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, our ASEC technician was present at the above referenced site for the purpose of visually inspecting the dam footprint and slope on the north side of the keyway, an area approximately 101×38 feet
The dam footprint and slope evaluation were performed by visual inspection and hand probing testing.

During the evaluation, some soils were found to be soft, wet with some organics.  The contractor was requested to taking out approximately 2 feet of these soils to reach the residual soils.  Following this, the area was ready for the placement of the new fill. 

See attached pictures.

Technician Signature / DateAminullah Azimi, September 20, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022